One Redliff Bristol

Screed Replacement

Creid is currently working on a basement car park in a grade 1 office block in Bristol city centre. The removal of the existing screed and installation of new screed had to be carried out at night with the car park remains open during the day.

Work includes:
  • Waterproof and structural concrete repairs
  • Removal of existing screed
  • Cart away of 30 loads of arisings
  • Install of new screed laid to fall to fixed drainage positions
  • Soffit, wall and column painting
  • Install of high build epoxy floor for VIP standard carpark
  • Line marking and signage
Client Representative: JLL
Consulting Engineer: Clarke Bond
Principle Contractor: Creid Surfaces